Legionella Schematic Drawings in Yorkshire

Clear, accurate schematic drawings of your hot and cold water systems, evaporative cooling systems (cooling towers and condensers) and spa pools – surveyed on site and drawn to comply with ACoP L8, HSG274 Parts 1, 2 & 3 and HSG282.

Close-up of a water services schematic showing two water heaters, a hot water circulation pump, a cold water booster set, isolation valves and flow and return pipework in a hotel plant room
Close-up of the plant room on one of our water services schematics for a hotel. View the full drawing.

Do you need a water services schematic?

If you are responsible for a building's water system, the HSE expects you to know what that system is made up of and where everything is. The Approved Code of Practice L8 and the technical guidance HSG274 Part 2 both refer to an up-to-date schematic:

  • HSG274 Part 2 says your legionella risk assessment should include a description of the water system, including an up-to-date schematic diagram
  • An up-to-date schematic plan of the system is listed as part of your written scheme of control
  • A schematic shows the risk assessment has covered every part of the system, not just the parts that were easy to get to
  • It helps you set up and run your monitoring regime – knowing exactly where your sentinel outlets, thermostatic mixing valves (TMVs), water heaters and little-used outlets are

Had a risk assessment without a schematic?

Not every legionella risk assessment comes with a schematic drawing. Some companies sell the risk assessment on its own and charge for the drawing separately later, and existing drawings are often lost or out of date after refurbishments and alterations.

We can survey your pipework and produce a schematic drawing as a standalone service.

What is a simplified schematic?

HSG274 Part 2 describes a schematic diagram as “a simplified but accurate illustration of the layout of the water system”. It is not a formal technical drawing and it is not drawn to scale. It is a clear 2D line drawing that shows, floor by floor, how water gets from the incoming mains to every outlet in the building.

How it works

  1. Get in touch with the site address and a rough idea of the building's size and use, and we'll give you a quote.
  2. Site survey. Mark visits the site and traces the pipework through plant rooms, tank rooms, risers and outlets, where access allows.
  3. Your drawing. The schematic is drawn up and supplied as a clear PDF. CAD format is available on request.

Request a quote Call 07921 841742

Included with our risk assessments

Every legionella risk assessment we carry out includes a simplified schematic drawing as standard, unless agreed otherwise. If you need both, it is usually most cost-effective to have them done together on the same visit.

Simplified schematic or as-fitted drawings?

For most buildings, a simplified schematic is what ACoP L8 and HSG274 expect. Some sites need more: complex recirculating hot water systems with subordinate and tertiary loops, and healthcare premises following HTM 04-01, may need detailed as-fitted drawings, which are normally produced by an engineering contractor. We'll tell you honestly which you need.

Read more in Mark's article: Schematic drawings – are they required? How detailed should they be?

Frequently asked questions

Do I need a schematic drawing for my legionella risk assessment?

HSG274 Part 2 says the risk assessment should include a description of the water system with an up-to-date schematic diagram, and that a schematic should form part of your written scheme of control. In practice, almost every site with a hot and cold water system should have one.

Can you produce a schematic without a risk assessment?

Yes. We produce schematic drawings as a standalone service, including for sites where another company carried out the risk assessment.

What format will I receive?

Your drawing is supplied as a clear PDF that you can view, print and keep with your legionella records. CAD format is available on request.

Do you need access to the whole building?

To draw the system accurately we need access to plant rooms, tank rooms, risers and every room with an outlet. Any areas we can't access are noted on the drawing.

What areas do you cover?

We are based in York and produce schematic drawings for sites across North, West, South and East Yorkshire.

Areas we cover

Based in York, we survey and produce water services schematic drawings across North, West, South and East Yorkshire, including York, Leeds, Harrogate, Selby, Wakefield, Bradford, Hull, Sheffield, Doncaster, Scarborough, Malton, Northallerton, Ripon and Thirsk.

Need a schematic drawing of your water system?